Recruitment and timeline
How long recruitment will really take when sites open one by one, some recruit slower than others, and many people screened are not eligible. See your chance of finishing on time, and what it costs.
More options
How much sites differ
Chance of finishing on time
96%
Of reaching 768 participants within 18 months.
Expected time
14 months
80% range: 11 to 17 months.
Budget at the expected time
$283,200
Budget if it runs long (90th percentile)
$319,200
If every site recruited at the average rate from day one
9.8 months
Participants recruited over time
The shaded band covers 80% of simulated runs.
For your protocol
Recruitment of 768 participants was simulated 400 times across 12 sites opening over 6 months, each screening about 10 people a month with 35% ineligible or declining, and with sites differing moderately in their rates. Recruitment is expected to take 14 months (80% range 11 to 17), with a 96% chance of finishing within 18 months.
How this simulation works
Sites open evenly over the ramp-up period. Each site gets its own recruitment rate, drawn around your average (sites that differ a lot make the total slower and less predictable). Every month each open site screens a random number of people (Poisson), and a share of them are not eligible or decline. The run ends when the target is reached. Repeated hundreds of times, this gives the range of finishing times. Costs assume fixed monthly running costs plus a cost per participant.